Hudson River PCB Cleanup
About 2.75 million cubic yards of PCB-contaminated sediment were dredged from the Upper Hudson River between 2009 and 2015.
Photo: Jessica Spengler, CC BY 2.0. Source.
Last reviewed: 1 source cited
Explain Like I'm 10
- Factories left A group of industrial chemicals that stay in water, mud, and animals for a long time. Glossary, a long-lasting industrial chemical, in the mud of the Hudson River.
- The U.S. EPA required dredges to dig out the most contaminated mud.
- About 2.75 million cubic yards were removed from 2009 through 2015.
The Five W's of Hudson River PCB Cleanup
Who
The U.S. Environmental Protection Agency leads the Hudson River PCBs The U.S. program that cleans the country's most contaminated sites and holds polluters to the cleanup. Glossary site. General Electric carried out the dredging required by EPA's cleanup decision.
Source: U.S. EPA, Hudson River cleanup
What
EPA's 2002 decision called for dredging about 2.65 million cubic yards of PCB-contaminated Sand, mud and gravel carried by water that settles on river beds, lake bottoms and beaches. Glossary. Across six seasons, about 2.75 million cubic yards were removed.
Source: U.S. EPA, Hudson River cleanup
When
Dredging began in 2009 and finished in fall 2015. Phase 1, in 2009, removed about 283,000 cubic yards. Phase 2 removed about 2.5 million cubic yards.
Source: U.S. EPA, Hudson River cleanup
Where
The work was on the Upper Hudson River in New York, a 40-mile stretch from Fort Edward to Troy.
Source: U.S. EPA, Hudson River cleanup
Why
PCBs stay in river mud and can build up in fish. Removing the targeted sediment is the dredging part of the remedy. EPA says sampling of water, sediment, and fish continues.
Source: U.S. EPA, Hudson River cleanup
Impact Statement
Government solution · active
Over six seasons, from 2009 to 2015, about 2.75 million cubic yards of PCB-contaminated sediment were taken off the Upper Hudson river bottom.
Source: U.S. EPA, Hudson River cleanup
How This Saves People & the Planet
For People
The dredging targets a river people fish. EPA says water, sediment, and fish are still sampled after the digging ended.
Source: U.S. EPA, Hudson River cleanup
For Nature
Removing PCB-contaminated mud from a 40-mile reach takes out contamination that can move through the river food web.
Source: U.S. EPA, Hudson River cleanup
Learn About Hudson River PCB Cleanup
There is no donate button, because this is a public agency or public body. Saving Planets is showcasing this work, not partnering with it.
Help This Work
This is a federal Superfund cleanup, so there is no donate button. Saving Planets is showcasing this work, not partnering with it.